So things are going well with the Zeala WATSAN improvement project and so many of you helped make possible. 5/15 Soak pits are mostly complete, we have started one latrine, all materials have reached Zeala (which is not easy or cheap), and we have made the bricks for the pump. We are behind schedule with the soak pits and latrines but on time for the pump. We hope to get a mason in the next two weeks to fix up the pump structure. I've really been enjoying site and have gotten back into the grove. Everything is moving so fast!
Here is a link to some pictures I posted on Facebook: http://www.facebook.com/album.php?aid=2900244&id=13705312&l=2283fb1bb6
Hope to post more later!